So, having bought a gas-less MIG welder a few weeks ago (for something else) we decided to tackle that part of the failure list first! there were two rust holes, no more than 2" dia each side on the front part of the floor near the door hinge. not enough to weaken the structure but as they are within 300mm of a suspension mounting point, they were a failure item.
This is what we found when the carpets were taken up...
The other side cleaned up with the angle grinder, ready for welding...
& this is the patch welded in place, ready for painting... as MIG welding skills are still at the development stage I decided to weld it on the inside rather than try to weld upside down!!
No comments:
Post a Comment